A country in transformation. An international-scale project.
Project context
EXPO 92 and the Barcelona Olympic Games represented one of the largest infrastructure developments in recent España history. An environment of maximum demand in terms of planning, coordination and construction pace.

Challenge
Simultaneous execution of multiple structures (buildings, sports facilities and urban spaces) with very tight deadlines and high logistical pressure.

Solution MAQUIOBRAS
Supply of vertical and horizontal formwork systems for the execution of walls, pillars and slabs in different types of work.
Solutions adapted to the diversity of geometries and the need for immediate availability of material.
Result
Continuity in the construction pace in a highly demanding environment, where the response capacity and versatility of the system were key to the progress of the works.